Emergency
×

Smell gas or have a power outage?

Please call

(800)-276-2722
Search

UGI Maintenance May Cause Delays; Avoid Maynard Street Bridge

24 Aug 2011

Reading, PA (August 24, 2011) – UGI Penn Natural Gas crews will be conducting pipeline maintenance at the intersection of Riverside Drive and Maynard St., South Williamsport today starting at 3 p.m. for several hours, possibly well into the evening.

Flagmen will be in place during the work that may cause traffic delays. Anyone traveling to South Williamsport is advised to avoid the Maynard Street Bridge coming from I-180 into the Borough.

Instead, motorists entering South Williamsport are urged to use Route 15 South/the Market Street Bridge.

Anyone traveling to South Williamsport from the Duboistown area is advised to cross the River at the Arch Street Bridge, travel through Williamsport and enter the Borough crossing the at the Market Street Bridge.

×